A two level below elevation grade parking garage located in Phoenix, Arizona required excavation of the top deck. These repairs include full depth and partial depth concrete removal and replacement along with rebar installation and welding of the new reienforced rebar which was then coated with an anti-corrosive agent. You may also be able to see in the photo that we also installed a cathodic anode protection system.